KEY INTERNAL FACTORS CAUSING SCHEDULE DELAYS IN YEMEN-MOBILE TELECOM TRANSCEIVER SITES PROJECTS

Main Article Content

Mohammed Ahmed M. Aqlan
Wael Alaghbari
Farouk A. Al-Fahaidy

Abstract

In Yemen, telecom projects frequently experience schedule delays, which in turn impede the successful execution of strategic initiatives and the effective deployment of new public services. This study aims to investigate the internal factors causing schedule delays in Yemen-Mobile’s transceiver sites projects. A re-structured questionnaire was distributed to employees involved in the implementation of transceiver sits projects in Yemen Mobile. Of the 191 questionnaires distributed, 154 valid responses were collected and used for analysis. The study identified ten major factors that have a significant detrimental influence on project schedules and caused delay. Procurement phase - related issues emerged as the most influential. These factors included a lack of technical equipment, supplier-related delays, lengthy purchasing procedures and unqualified technical equipment suppliers. Furthermore, Delays in the implementation phase also include delays in fiber optic network connection, security-related material and equipment delays to the project site and implementation start barriers. In addition to, the lack of comprehensive procurement planning, ineffective the strategy of addressing challenges of sites acquisition and lack of monitoring and control plans were identified as a critical planning issue. The study provided practical recommendations for improving procurement management, boosting the efficiency of the implementation phase, and addressing planning issues.

Downloads

Download data is not yet available.

Article Details

How to Cite
Aqlan, M. A. M., Alaghbari, W., & Al-Fahaidy, F. A. (2026). KEY INTERNAL FACTORS CAUSING SCHEDULE DELAYS IN YEMEN-MOBILE TELECOM TRANSCEIVER SITES PROJECTS: . Sana’a University Journal of Applied Sciences and Technology, 4(1), 1481–1495. https://doi.org/10.59628/jast.v4i1.2292
Section
Article

References

E. S. Balashova and E. A. Gromova, Agile project management in telecommunication industry, 41 ed., vol. 38, Revista espacios, 2017, p. 30.

M. Al-Bashiri, Impacts Of the War on The Telecommunications Sector in Yemen, vol. 21, i. c. DeepRoot Consulting, Ed., 2021.

N. A. Kaid, Project Management Methodologies (Pmm) Impact on Projects’ Success of Mobile Telecom Operators in Yemen. Master dessertation, Open University Malaysia, 2018.

(PMBOK guide) A guide to the project management body of knowledge, Project Management Institute, 2017.

A. Lester, Project Management, Planning and Control : managing engineering, construction and manufacturing projects to PMI, APM and BSI standards, Joe Hayton, 2017.

E. M. Mwanaumo, M. Mambwe, B. G. Mwanza and E. Sibalwa, "An Investigation of Factors Causing Schedule Overrun in Telecommunication Projects in Zambia.," in 2nd African International Conference on Industrial Engineering and Operations Management, Zimbabwe, 2020.

D. Anaba, Evaluating the causes of delays in the construction of Telecommunication Towers in Ghana (Master dissertation), Nkrumah University of Science and Technology, 2021.

FCC, Plan Ahead for Phase Out of 3G Cellular Networks and Service, Consumer guide, Washington: Federal Communications Commission, 2022.

Y. H. Al-Mamary, A. Shamsuddin, N. A. Abdul Hamid and M. . H. Al-Maamari, "Issues related to employees at telecommunication companies in Yemen and the role of management information systems in solving it," International Journal of Hybrid Information Technology, vol. 8, no. 12, pp. 377-390, 2015.

I. T. U. (. I. ). World Telecommunication/ICT Indicators Database, "Mobile cellular subscriptions - Rep. Yemen," 2023.

C. Yemen Mobile, "2022 Annual Report," Yemen Mobile Company, Sana'a, 2022.

K. A. A. Saeed, Project Management Effectiveness and its impact on Project Success in Yemen Mobile Company. Master's thesis, Yemen Academy for Graduate Studies, 2024.

K. Nicos and M. Athanasios, The PM² Project Management Methodology Guide 3.0, Luxembourg: the European Commission, DIGIT, 2018.

J. K. Pinto, Project management: achieving competitive advantage 5th Edition, Pearson Education Limited, 2020.

H. Kerzner, Project management: A systems approach to planning, scheduling and controlling 12th Edition, John Wiley & Sons, Inc., Hoboken, New Jersey., 2017.

L. . I. Duru and M. A. Alhasweh, Improving Project Management Performance A Case Study of Mobile Telecom Site Rollout Project in MTN Syria (Master Thesis), Stockholm, Sweden: Master of Science in Project Management and Operational Development 60 ETCS, 2012.

A. A. A. Mohammed, Improving Site Rollout Projects in MTN Yemen Company (Master Dissertation), MALAYSIA: USTY OPEN UNIVERSITY, 2016.

R. H. M. Mohmed and N. T. Alsohybe, "Evaluating Project Management Methodologies in Yemen`s Telecommunications Sector: Challenges and Solutions for Sustainability," International Journal for Scientific Research (IJSR), vol. 3, no. 8, 2024.

S. A. Ahmad, U. H. Issa, M. A. Farag and L. M. Abdelhafez, "Evaluation Of Risk Factors Affecting Time And Cost Of Construction Projects In Yemen," International Journal of Management (IJM), vol. 4, no. 5, pp. 168-178, October 2013.

S. W. VanderStoep and D. D. Johnston, Research methods for everyday life: Blending qualitative and quantitative approaches, Jossey-Bass, 2009.

C. Dawson, Practical Research Methods A user-friendly guide to mastering research techniques and projects, 2002.

H. Danso and J. K. Antwi, "Evaluation of the factors influencing time and cost overruns in telecom tower construction in Ghana," Civil and Environmental Research, vol. 2, no. 2222-1719, 2012.

E. M. Asiedu and M. Mkansi, "A comprehensive assessment of time overruns in Ghanaian telecom cell site construction," Cogent Engineering, vol. 9, no. 1, 2022.

D. Bakhtiar, M. R. Mashudi and M. Galinium, "Determining Critical Factors Project Delay and Effecting Cost Overruns in Telecommunication Mobile Network Projects," in Annual Conference on Management and Information Technology (ACMIT), Indonesia, 2019.

S. Hamali, A. G. R. Nurfanka, A. M. Firdausi and M. S. Firdausi, "Evaluation of the delayed fiber optical installation project on pre-sales division at PT XYZ," in IOP Conference Series: Earth and Environmental Science, Indonesia, 2020.

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.